Engineer-to-order firms will work with the customer to design the product,and then make it from purchased materials,parts,and components.

A) True
B) False

Correct Answer

verifed

verified

Using the assembly-line balancing procedure,which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7,4,7,8,9,4,3 and 6 minutes,and the cycle time is 8 minutes?


A) 3
B) 5
C) 6
D) 8
E) None of the above

F) A) and B)
G) A) and E)

Correct Answer

verifed

verified

Assembling-to-order means moving the customer order decoupling point from finished goods to components.

A) True
B) False

Correct Answer

verifed

verified

Describe the implications of the product-process matrix for process design in a competitive situation.

Correct Answer

verifed

verified

The product-process matrix is represente...

View Answer

Which of the following basic types of process structures is one which similar equipment or functions are grouped together?


A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process

F) A) and B)
G) All of the above

Correct Answer

verifed

verified

Assume a fixed cost for a process of $15,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25.Which of the following is the number of units that has to be produced and sold to break-even?


A) 500 units
B) 667 units
C) 790 units
D) 900 units
E) 1,000 units

F) A) and D)
G) C) and D)

Correct Answer

verifed

verified

The efficiency of an assembly-line is found by a ratio of the sum of all task times divided by the cycle time.

A) True
B) False

Correct Answer

verifed

verified

In designing a production line mixed-model line balancing might be used by JIT manufacturers.

A) True
B) False

Correct Answer

verifed

verified

A high-level map or diagram of a supply chain process can be useful to understand how material flows and where inventory is held.

A) True
B) False

Correct Answer

verifed

verified

In a workcenter,machine A has a ten minute set-up time per batch and a two minute per unit run time.Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit.The workcenter makes products in batches ranging from one unit to one hundred units.Assuming capacity is not a limitation on either machine,on which batches should machine B be used?


A) All batches should be run on machine B
B) Batches of more than 20 units should be run on machine B
C) Batches of fewer than 80 units should be run on machine B
D) Batches with up to 50 units should be run on machine B
E) No batches should be run on machine B

F) A) and B)
G) B) and E)

Correct Answer

verifed

verified

Assume a fixed cost for a process of $120,000.The variable cost to produce each unit of product is $35,and the selling price for the finished product is $50.Which of the following is the number of units that has to be produced and sold to break-even?


A) 5,000 units
B) 6,000 units
C) 8,000 units
D) 11,000 units
E) 12,000 units

F) A) and B)
G) None of the above

Correct Answer

verifed

verified

Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?


A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process

F) A) and E)
G) A) and B)

Correct Answer

verifed

verified

Which of the following is not a step in developing a manufacturing cell layout?


A) Grouping parts into families that follow a common sequence of steps
B) Identifying dominant flow patterns of parts families as a basis for location of processes
C) Physically grouping machines and processes into cells
D) Disposing of left-over machinery and outsourcing ungrouped processes
E) None of the above

F) All of the above
G) B) and D)

Correct Answer

verifed

verified

You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure.The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes.Which of the following is the correct value for the resulting line's efficiency?


A) 0.500
B) 0.833
C) 0.973
D) 0.990
E) None of the above

F) A) and E)
G) D) and E)

Correct Answer

verifed

verified

A process map shows the physical location of the various processes within a supply chain.

A) True
B) False

Correct Answer

verifed

verified

The objective of mixed-model line balancing is to meet the demand for a variety of products and avoid building high inventories.

A) True
B) False

Correct Answer

verifed

verified

The formula (Inventory = Throughput rate × Flow time. )is known as what? ___________________

Correct Answer

verifed

verified

Little's Law
Explanation: Simple systems...

View Answer

Using the assembly-line balancing procedure,which of the following is the required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units?


A) 0.104
B) 50
C) 9.6
D) 480
E) Cannot be determined from the information above

F) B) and D)
G) C) and D)

Correct Answer

verifed

verified

Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10,and the selling price for the finished product is $50.Ignoring inventory,how many units must the firm sell to break-even? ______________________

Correct Answer

verifed

verified

2,500 units
Explanation: Contr...

View Answer

An example of an assemble-to-order firm is Dell Computer.

A) True
B) False

Correct Answer

verifed

verified